Strengthening and asphalt overlay of the existing runway, taxiway and aprons.
Construction and widening of existing runway, reconstruction of existing cross taxiways and parts of the runway, taxiway, apron and shoulders.
Major quantities; removal and disposal of existing pavement (6,200 m3), bituminous leveling (18,250 tons), bituminous base course (68,640 tons) and bituminous surface course for overlay (67,370 tons)
Value
$5,882,584Client
Eithiopian Civil AviationConsultant
Transport Construction Design Share CompanyLocation
EthiopiaCompletion Date
2003